Length of Simulation (in decimal days): 100.0 Number of Machine Groups: 5 Number of machines in each group: 8 11 7 2 7 Number of Standard Job Types (SJTs): 3 For SJT 0, mean time between sales (days): .25 For SJT 0, number of steps in routing: 4 For each step in routing... Machine Process Priority Nr. in shop Group Time(Days) at step Initially First step: 3 0.4 3 14 Second step: 2 0.2 1 9 Third step: 0 0.6 2 4 Fourth step: 1 0.5 2 6 For SJT 1, mean time between sales (days): .10 For SJT 1, number of steps in routing: 3 For each step in routing... Machine Process Priority Nr. in shop Group Time(Days) at step Initially First step: 4 0.3 1 8 Second step: 2 0.6 1 5 Third step: 0 0.5 1 10 For SJT 2, mean time between sales (days): .15 For SJT 2, number of steps in routing: 3 For each step in routing... Machine Process Priority Nr. in shop Group Time(Days) at step Initially First step: 1 0.7 3 0 Second step: 4 0.6 3 4 Third step: 1 0.8 3 11